Lots of progress!  Our permanent furnace was installed and ducts cleaned.  Floors are finished and kitchen cupboards installed.  The stairs were just finished the afternoon before the movers were scheduled.  I laid paper and cardboard on all the hardwood floors for protection. 



 
 

We spent Valentine’s Day moving, before our traditional dinner at Harvey’s.  The movers we used last spring were excellent so got them again – their slogan is “Sober Movers”! 
 
 
 
Judy got to the cottage at 8:00 am to meet the POD being delivered while we waited at the condo.  There were a few big things from the condo that got loaded up – the TV, my china cabinet, Ibby’s pinball machine – things we just didn't want in either a POD or an unheated storage locker.  Then we stopped by the storage locker for a few more larger pieces.  Once at the cottage the guys brought our appliances up from the basement, the truck was unloaded then the POD unloaded.  We forgot what some of our furniture looked like!  All the furniture was placed in the middle of each room until the trimwork and painting is done. 
 
 
But we do have an operational beer fridge now! 
No more snowbanks for us… 
 
 
Down here at the condo we were able to turn the couch around and have a smaller TV by a support post.  So it means we are now facing the lake and finally enjoying the view!  Still boxes here that won’t go until we have furniture in place at the cottage and can unpack them.

 

This past week Tony was working on the bathroom and shower stall while Stephen continued on with the trimwork.  And I cleaned and cleaned!  Want window ledges and baseboards to be as clean and dust-free as possible before the painters came.  Bill measured for the outside deck railing, only to discover that we needed a couple of extra parts, which of course are special order because of the colour we chose.  Then we will still need some welding done before that can be installed.

 

Cousin David helped Ibby move a couple of mattresses that ended up at the wrong house.  Ibby & I made many trips back & forth from one of the storage lockers which was emptied totally and turned back in.  We had that 2nd small locker with miscellaneous last-minute things including our water heater, woodstoves, couch cushions, and misc boxes.  It was 2/3 empty already, but I just wasn’t ready for the boxes until after the furniture was there, so chose to bring that misc stuff over myself.  We still have the bigger locker with holiday decorations and sewing things, but at least now we’ve freed up $400 every month between the POD and small locker rental.

 

The painters arrived this past Monday and are blitzing right on through.  Will be done this week, then the plan is to move our furniture into place and settle in a bit on the weekend.  Still to follow will be the countertops, sinks & toilets, shower door, stair railings, appliances to install, and a tiny bit of electrical to finish off.  All little bits that are pending and either out for quote or in the process of being manufactured.  Then once the dust is gone – if it ever is gone! – will have the old clawfoot bathtub reglazed and installed upstairs.  Stephen took extra care in building a window ledge in the bathroom wide enough to place my glass of wine on it! 
 
 
And this month Ibby has averaged 30 hours every week of overtime.  A big migration plus the usual support stuff.  He's exhausted, but a trooper and still moving stuff or whatever needs to be done.
 

Can’t believe it’s been nearly a year since we bought the condo and dove into this adventure!  We truly are on the home stretch.  Thanks for following along with us!