We’ve come a long way in one short month! While we were away, with the help of the surveyor
siting the structure, the footings and foundation were poured. We got back just in time to see the framing
going up. After getting home at midnight
on a Sunday, bright and early Monday morning I was placing the window order. Unfortunately that was just about ready to
go, then I left in a rush. Hope the
delayed order doesn’t hold things back.
We also decided on siding colour in a board & batten style, and have
been exploring deck options given that half of our deck is on top of the garage
(a flat roof which means drainage issues).
We’ve initiated the process to get the hydro reconnected, the HVAC guys
are now starting on designing the ductwork, and the plumber has been out
several times already running preliminary lines and moving existing lines.
Thanks again to Bill, Trevor, Tyler and the entire Weisflock crew for keeping things moving along!
We’re also dealing with landscaping much earlier than I
anticipated. Thought we could wait until
the spring, but the guys warned that once winter comes and then there is
melting snow in the spring that would be bad.
Because we’re on such a slope, need to put in a few retaining walls now
to protect against that. A truckload of
stone was just delivered yesterday, and they are placing most of it today. We have very sandy soil which is bad for
runoff but good as a stone bed.
At the site there have been little tweaks made along the
way. A window or wall moved this way or
that but sometimes just a couple of inches will have a big impact on another
area. For example, recessing the fridge
in lieu of having a 2nd full depth coat closet provided an extra foot
in the kitchen traffic lane. Seems like
every day I’m either meeting with someone at the site, driving out to a lumber
store, or doing massive research on the web.
The guys give me lists written on blocks of wood. We’re also trying to anticipate anything we can now. For example, we had the plumber run 2 lines
from the well to the house so we have a back-up. Also roughing in plumbing for the basement
now.
On the home front, Jaime and his housemates left on Tuesday
for a week in Florida! They are renting
a house and going to Universal 2 days, Disney one day, and another evening at
Disney for Mickey’s Not-So-Scary Halloween Party. Special parades, fireworks, and the boys get
to trick-or-treat at the Magic Kingdom.
How cool is that! Jaime will be
celebrating this 19th birthday down there, so Mickey’s party was our
gift to him. It was a little rushed
getting him organized and packed once I got home, but the staff at his house
had everything well in hand. We’re so
grateful Jaime has this awesome opportunity!
So as I’ve been typing this text, I’m sitting lakeside at
the picnic table on a gorgeous fall day.
The leaves are turning colours, the geese are flying overhead, the site
mascot dog Teak is chasing her ball, and I’m reminded of why we are moving
here. As if I needed a reminder! The only thing needed to make the scene
complete would be a soundtrack of Earth, Wind & Fire blasting out
“September”. We are very lucky indeed.